Skip to content
Memorial Villages
Paige Martin · Real Broker, LLC
Menu

Hunters Creek Village zoning rules to check before you build

Lot Size, Yard and Survey Rules for Hunters Creek Village in Memorial Villages

Updated November 2026

What lot size, yard, fence and survey rules apply to a Hunters Creek Village lot in Memorial Villages before I buy or build?

In November 2026, Zoning Ordinance No. 340 in Hunters Creek Village bars building on lots under 22,500 square feet and requires a twenty-five-foot rear yard and a surveyed, staked lot.

Paige Martin, Houston Properties Team, Memorial Villages

Source: City of Hunters Creek Village, Zoning Ordinance No. 340, November 2026.

Watch

Hunters Creek Village Lot Rules: Lot Size, Rear Yard, Fences Near Trees and Surveys Got a start date and your eye on Hunters Creek?

What is the smallest lot Hunters Creek Village lets you build on?

In Hunters Creek Village, Zoning Ordinance No. 340 sets the floor at 22,500 square feet. Under that ordinance, no building may be constructed on a lot smaller than that.

The village's code carries one exception for older parcels. A single-family house may still go up on a smaller lot that existed in separate ownership of record on March 25, 1955.

Treat 22,500 square feet as a minimum, not a description of what is for sale. Confirm a lot's area from its survey before you rely on a listing's figure.

The floor differs village by village. Piney Point Village's code, for comparison, calls for lots of at least 40,000 square feet.

How deep does the rear yard have to be on a Hunters Creek lot?

Zoning Ordinance No. 340 requires a rear yard at least twenty-five feet deep. The wording sets a minimum, so a plan may leave more open ground behind the house, never less.

On a deep lot, the twenty-five feet is easy to meet. On a shallow one, it can decide how far back a new house or an addition reaches.

Ask the village in writing how it measures the rear yard on the lot you are weighing. Keep that answer with the survey.

There shall be a rear yard having a depth of not less than twenty-five (25)feet.
City of Hunters Creek Village, Zoning Ordinance No. 340, November 2026.

Can a fence near a tree use wrought iron or wood in Hunters Creek Village?

Yes, where trees would otherwise have to come out. The ordinance lets wrought iron and wood sections go into any fence or wall where that keeps trees standing.

The rule is written to control over any contrary provision in the ordinance. Its reach is limited to the extent necessary to avoid removing trees.

Before a fence is designed, walk the line with the plan and mark each tree near it. Then ask the village which materials it expects for the remaining sections.

Controlling over any provisions of this Ordinance to the contrary, wrought iron and wood sections of any fence or wall shall be permitted to the extent necessary to avoid removing trees.
City of Hunters Creek Village, Zoning Ordinance No. 340, November 2026.

What survey has to back the plans for building on a Hunters Creek lot?

Plans filed with a building permit take their lot dimensions from an actual survey. Ordinance No. 340 requires that survey to come from a qualified registered surveyor.

The rule covers both the location and the size of the lot to be built on. Plan dimensions rest on that survey rather than on a listing sketch.

A second step follows: the lot is staked out on the ground before construction starts. Book the surveyor with both jobs in mind.

All dimensions shown on these plans relating to the location and size of the lot to be built upon shall be based on an actual survey by a qualified registered surveyor and the lot shall be staked out on the ground before construction is started.
City of Hunters Creek Village, Zoning Ordinance No. 340, November 2026.

How do these Hunters Creek rules fit a purchase timed to a move date?

A start date leaves little room to find a lot rule after closing. Settle the lot area, the rear yard and the trees before the contract binds you.

Ask for each lot's survey early in the search, and check its area against the 22,500 square foot floor. For an older, smaller lot, ask the title company about the 1955 ownership history.

If you plan to build or rebuild, line up a qualified registered surveyor before closing. Staking comes before construction, so the survey sits early on any building calendar.

Paige Martin works with people seriously considering a Memorial Villages-area move in the next 6 to 18 months. Paige has sold over $100 million of Memorial Villages real estate since 2002.

Send her the Hunters Creek addresses and your start date. Ask which lot records each file still needs before you travel.

Questions & answers

Memorial Villages questions, answered

How much of a Hunters Creek Village lot can buildings cover?

Hunters Creek Village's code caps building area at 25 percent of the lot, and outdoor swimming pools are left out of that count. Building area is a footprint measure, so it limits what sits on the ground rather than total living space across floors. Ask the village in writing how the cap applies to the lot you are weighing before plans are drawn.

Coverage rules differ across the six villages, so the same house can fit one lot and not another. Piney Point Village, for example, lets building area cover up to 30 percent of a lot, counted without roadway easements, driveways or uncovered walkways. Its code also caps all structures and impervious surfaces together at 50 percent. On a purchase timed to a start date, an architect's plan for the specific lot answers how large a house it holds. Bring the lot's survey to that conversation, since coverage is figured against the lot's area.

How tall can a new house be in Hunters Creek Village?

Hunters Creek Village's code lets the main residence reach 35 feet on a lot under 40,000 square feet, and 38 feet on a lot of 40,000 square feet or more. Its zoning ordinance exempts church steeples from the 35-foot limit. Ask the village how it measures height on your lot before a design is finished.

Height and yards are tied together in the code. Above 35 feet, the required side yards and rear yard each grow by an additional five feet. A taller design therefore gives up some ground at the edges of the lot. Chimneys are a separate question. Hilshire Village counts them toward its height limit, and Bunker Hill Village lets them rise up to five feet above the roofline in District A. For a Hunters Creek design, ask the village how it treats a chimney, and get the answer in writing.

Do I need a permit to build a fence in Hunters Creek Village?

Yes. Hunters Creek Village's zoning ordinance requires a building permit before work starts on any building, structure or fence. The rule reaches remodeling, enlarging, altering and converting as well as new work, and it binds whoever does the work or causes it to be done. Apply before a fence crew is booked.

Near trees, plan the permit and the materials together. Hunters Creek's code also requires a permit before anyone removes a protected tree, so a fence line that would take a tree out raises a second permit question. On a fixed move date, raise the fence plan early. Ask the village what the application needs and how long review takes, and keep its written answers with the permit file.

What does Hunters Creek Village want before trees come out to build a new house?

An owner who wants to remove protected trees to build submits a current tree survey and a tree disposition and protection plan to the building official. The city grants that permit where each removal is shown necessary for a reasonable use of the site, and where all alternatives, including redesign, have been considered.

A five-year bar follows. For five years after the first permit is issued, no permit is granted to remove more protected trees there for a similar improvement. Plan every tree removal the project needs in one application rather than in stages. That code section, 18-20, carried an August 2023 version date. Confirm the current rule with the city before relying on it.

If I do not order a new survey when I buy a Hunters Creek lot, can I still build on it later?

The purchase and the build follow different rules. Under TREC's current wording in Paragraph 6C(2), a buyer may obtain a new survey rather than shall. Building is another matter: Zoning Ordinance No. 340 in Hunters Creek Village bases permit plan dimensions on an actual survey by a qualified registered surveyor, so a build brings that survey back.

If a rebuild is part of the plan, one survey ordered with both the purchase file and the later permit in mind can save a step. Ask the surveyor how the work can be prepared for the permit plans, and ask the village what it will accept.

What do clients say on Google?

We could not have asked for a simpler or more enjoyable home buying experience. Not only did we love the realtors that we personally interacted with, but we had a whole team of support at Houston properties. Everyone was very professional and friendly and made sure we were always up to speed. 10/10 would recommend!
Michelle R., Google review, Houston Properties Team, 10 October 2022

Read more reviews on Google

Your next step

Moving to Memorial Villages? Paige's team previews homes before you fly in.

Call Paige's team at (713) 425-4194 or email PMartin@HoustonProperties.com to talk through your move and the homes on your list.

Your message and details go only to Paige Martin.